Phase 1 (n = 60) | Phase 2 (n = 60) | p-value | |
---|---|---|---|
Received at least 1 procurement | 96.5 (92.3, 98.5) | 98.2 (96.3, 99.2) | P = .23 |
Experienced stock out within the last 12 months | 23.5 (10.0, 45.9) | 28.7 (16.8, 44.5) | p = .64 |
Stock out duration within last 12 months | |||
Never | 76.5 (54.1, 90.0) | 72.7 (56.4, 84.5) | p = .68 |
Less than 1 month | 12.9 (4.6, 31.1) | 19.8 (9.5, 36.7) | |
1–3 months | 9.2 (2.4, 29.1) | 7.5 (3.1, 17.3) | |
Over 3 months | 1.4 (0.2, 10.2) | 0 | |
Expired stock at time of data collection | 18 (7.3, 38.1) | 20.4 (9.6, 38.4) | P = .81 |